INTEGRATION AND IMPLEMENTATION OF THE SLDC WATERFALL CYCLE WITH THE SCRUM CYCLE (IN THE PERIOD FROM 05.2016 TO 02.2018)

Implementation at ABC Data S.A. in the period from 05.2016 to 02.2018 the IT production cycle consisting of two parts, i.e. the WATERFALL part (Analysis, architecture development: (High Level Design (HLD) + Low Level Design (LLD)) and an integrated implementation process based on SCRUM, which means the combination and integration of these two production cycles. The integration takes place at the level of Use Cases (UML USE CASE), which are mapped to User Stories (Scrum). Architecture quality process management.

Framework agreement with Transition Technologies JSC (2011.04)

MCS has signed a framework agreement on cooperation with the Transition Technologies SA. The subject of cooperation will be a joint implementation of projects in the energy sector, audit and training activities.

THE NEW IMPLEMENTATION (2010.09)

MCS participates in the implementation of an ERP system “Impulse” BPSC JSC Dr. Jerzy Roszkowski serves as Quality Manager for the side of the Purchaser.